Moving from paper, Excel and SharePoint to Valkit
Authoring, IQ/OQ/PQ execution, backward and forward dynamic tracing, Change Intelligence and e-signatures aligned with 21 CFR Part 11 and EU Annex 11 in one cloud tool, with no seat limits.
As of November 18, 2026. By Valkit.ai Research Team.
Paperless
IQ/OQ/PQ with required evidence
Weeks
not months, to implement
Part 11
and EU Annex 11 aligned e-signatures
Per project
licensing, with no seat limits
Why Valkit
What sets Valkit apart
Paste a change. See what it touches.
Validate once. Reuse everywhere.
The Validation Asset Manager (VAM) is a reusable library of validated assets with governed reuse across packages, systems and sites.
Assets and their validation records tracked in spreadsheets or document foldersP0
Paperless IQ/OQ/PQ, with evidence enforced at every step.
Pass/fail steps, tester assignment, data capture tables and environmental imports. Request an emergency change mid-run with a reason and PIN; approvers clear it and stakeholders are notified. Every run closes with approved PDFs and evidence ZIPs.V2
Printed or file-based protocols completed by hand or in spreadsheets, with evidence attached or filed separatelyP0
Proof
Teams that have moved to Valkit
Both moved from another digital validation tool. Valkit's public press list includes:V6
about $6.95 billion
in revenue. A global lab technology company chose Valkit as its validation platform of record for computer system validation (July 27, 2026).
8,000+ batches
GMP. A multi-site cell and gene therapy CDMO selected Valkit as its validation system of record (September 21, 2026).
As of October 2026, Valkit reports 12,000+ validation documents digitized and 2,000+ users in North America, Europe and Asia.V1
Details
The rest, side by side
Valkit cells link to valkit.ai where the site states the capability, checked on November 18, 2026. The paper, Excel and SharePoint column describes a typical in-house setup, not a vendor product, so its cells point to the regulations that apply to any approach or are marked as depending on your own setup.
Scope
Valkit
CQV, CSV and CSA, plus lab instrument qualification, family-style qualification, tech transfer, MSAT and CDMO work, and new-site start-upsV1
Paper, Excel and SharePoint
Whatever your templates and SOPs coverP0
Audit trail and e-signatures
Valkit
Part 11 and Annex 11 aligned e-signatures; ALCOA+ audit trailsV3
Paper, Excel and SharePoint
Wet-ink signatures on paper. Electronic records must meet Part 11 controls such as secure, time-stamped audit trailsR1, and EU Annex 11 expects risk-based audit trails and e-signatures permanently linked to their recordsR2
Hosting
Valkit
Cloud SaaS built on a qualified microservices stack; multi-languageV3
Paper, Excel and SharePoint
Your own file stores, servers or document libraryP0
Integrations
Valkit
Jira and Azure DevOps import and sync; automation execution API for CI and test runnersV1V2
Paper, Excel and SharePoint
Depends on your setup; often manual transfer between toolsP0
Vendor validation package with each release
Valkit
End-to-end Validation Package with each validated release to support customer qualificationV3
Paper, Excel and SharePoint
Your team assesses and documents each new version of the tools it uses under its own proceduresP0
Questions
FAQ
Can Valkit replace paper IQ/OQ/PQ protocols?
Yes. Valkit runs IQ/OQ/PQ paperlessly with required evidence, data capture tables and environmental imports.V2
Do we have to use AI?
No. AI is optional, and every workflow works without it.V3
What validation support does Valkit provide?
Valkit provides an end-to-end Validation Package with each validated release to support customer qualification.V3
Does EU Annex 11 allow replacing paper with a computerized system?
Yes, provided there is no resulting decrease in product quality, process control or quality assurance, and no increase in the overall risk of the process.R2
How long does the move take?
Valkit states that customers implement in weeks, not months.V1
Where is our data hosted?
Valkit is built on a qualified microservices stack.V3
By Valkit.ai Research Team. Last updated: 18 November 2026. Comparisons are reviewed regularly. To report a correction, email [email protected].
Sources
- Valkit home page, https://valkit.ai, checked 2026-11-18. Also Valkit llms-full.txt, https://valkit.ai/llms-full.txt.
- Valkit Execute page, https://valkit.ai/product/execute, checked 2026-11-18.
- Valkit llms-full.txt, https://valkit.ai/llms-full.txt (last updated 2026-11-17), checked 2026-11-18.
- Valkit press page, company facts, https://valkit.ai/press, checked 2026-11-18.
- Valkit pricing page, https://valkit.ai/pricing, checked 2026-11-18.
- Valkit press page, coverage list, https://valkit.ai/press, checked 2026-11-18.
- Valkit Change intelligence page, https://valkit.ai/product/change-intelligence, checked 2026-11-18.
- Valkit Family Approach Equipment Qualification page, https://valkit.ai/product/family-qualification, checked 2026-11-18.
- General description of a typical in-house setup; not a vendor claim. Depends on your own SOPs, templates and configuration.
- 21 CFR Part 11, § 11.10(e), eCFR, https://www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-11, checked 2026-11-18.
- EudraLex Volume 4, Annex 11: Computerised Systems (revision January 2011, in operation from June 30, 2011), Principle and sections 9 and 14, https://health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf, listed at https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en, checked 2026-11-18.
- FDA, "Computer Software Assurance for Production and Quality Management System Software," final guidance issued February 3, 2026, https://www.fda.gov/regulatory-information/search-fda-guidance-documents/computer-software-assurance-production-and-quality-management-system-software, checked 2026-11-18.
